A Predictive Analytics Model for Early Detection of Budget Overruns in Large-Scale Projects Using Integrated Financial and Operational Data

Authors

  • Nnenna Linda Akunna School of Engineering, University of the West of England Bristol. United Kingdom
  • Onuh Matthew Ijiga Department of Physics Joseph Sarwan Tarka University, Makurdi, Benue State, Nigeria

DOI:

https://doi.org/10.38124/ijsrmt.v4i12.1372

Keywords:

Predictive Analytics, Budget Overrun, Project Cost Management, Financial-Operational Data Integration, TimeSeries Forecasting, Risk Modeling, Earned Value Management (EVM), Machine Learning in Project Management

Abstract

Budget overruns remain a persistent challenge in large-scale projects, particularly in sectors such as construction, oil and gas, and information technology, where complexity and uncertainty significantly influence cost performance. Traditional cost control models, including Earned Value Management (EVM), rely primarily on retrospective indicators, limiting their ability to provide early warning signals for emerging financial risks. This study proposes a predictive analytics framework for the early detection of budget overruns by integrating financial and operational data within a mathematically grounded modelling structure.

The methodology combines feature engineering, regression-based forecasting, and time-series modeling to estimate future cost trajectories. Key variables, including actual cost, schedule deviation, and resource utilization, are transformed into predictive features to capture dynamic project behavior. A novel Budget Overrun Risk Index (BORI) is introduced to quantify the extent of predicted cost deviation relative to the approved budget, enabling standardized risk assessment across projects. The model is evaluated using statistical performance metrics such as Root Mean Square Error (RMSE) and the coefficient of determination (), alongside cross-validation techniques to ensure robustness and generalization.

Results demonstrate that the proposed model significantly improves prediction accuracy compared to traditional EVM approaches, with lower error rates and higher explanatory power. Importantly, the framework enables the identification of cost deviation signals before 30–40% project completion, thereby extending the forecasting horizon and supporting proactive decision-making. Sensitivity analysis further confirms the impact of cost growth rate and schedule delays as dominant drivers of budget overrun risk.

The study concludes that integrating financial and operational datasets enhances model performance and provides a more comprehensive understanding of project dynamics. While challenges related to data quality and model complexity persist, the proposed framework offers a scalable and interpretable solution for real-time project monitoring. The findings contribute to the advancement of predictive analytics in project management and provide a foundation for future research on hybrid AI-driven cost control systems.

Downloads

Download data is not yet available.

Downloads

Published

2025-12-30

How to Cite

Akunna, N. L., & Ijiga, O. M. (2025). A Predictive Analytics Model for Early Detection of Budget Overruns in Large-Scale Projects Using Integrated Financial and Operational Data. International Journal of Scientific Research and Modern Technology, 4(12), 190–208. https://doi.org/10.38124/ijsrmt.v4i12.1372

PlumX Metrics takes 2–4 working days to display the details. As the paper receives citations, PlumX Metrics will update accordingly.

Similar Articles

<< < 35 36 37 38 39 40 41 42 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)